Candor Track & Field
Candor Central School handpicked Smith Site Development LLC as their preferred contractor to replace their aging track with a new rubberized track, long jump and pole vault pits. Also improve field and track drainage and install underground irrigation for their grass multi-purpose athletic field. Included upgrades to perimeter walking trail.
Scope of work:
Erosion Control Measures
Remove Topsoil and Full Depth Track subbase
Cut & Fill to Subgrade
Install Underground Track and Field Stormwater Drainage
Install Concrete Track Trench Drain
Install Field and Track Subbase Material
Install Underground Grass field Irrigation System
Install Underground Electrical Lighting
Install Asphalt Track
Assisted the Installation of Rubberized Track
Landscaping
Install Fence and Gates
Seed and Mulch
Revitalized Perimeter Walking Trail