Bainbridge-Guilford Tennis Courts
Smith Site Development was selected by Bainbridge – Guildford Central Schools to replace the unrepairable aging Tennis Courts, installing Six New Tennis/Pickleball Courts, complete with ADA Compliant sidewalks and curbing.
Scope of work:
Erosion Control Measures
Site Demolition of existing unrepairable Courts and fencing
Removal of concrete curbing, Saw cutting asphalt, overgrown tree removal
Full box out of Subbase Material
Installed new Subbase material
Installed New Concrete Curbing and ADA Sidewalk
Installed Tennis Court Asphalt
Installed Tennis/Pickleball Court Fencing