The City of Binghamton contracted with Smith Site Development to solve flooding in the Teamsβ Dugout areas and other subterrain sections of Mirabito Stadium which in the past caused damage and cancellation of games during the 2021, 2022, and 2023 Seasons. At risk was losing the Mets affiliate Double A Team. After an extensive study, it was determined to revamp the Storm water drain system by rerouting rain water from field and stadium structure to two underground water retention systems, Installing back flow preventers and increasing the size the sump pumps and drain lines.
Install Storm System Catch Basins & Proper Sized Piping
Install back flow preventers at City Storm System
Build 6,900 sf Picnic Pavilion
New Asphalt Binder and Top 450 Tn
Striping
Parking Stalls
Handicap Parking Spots
Scope of Work:
Install Erosion Control & Protective Construction Fencing
Remove existing Sump Pump Stations and Clean existing underground Drains
Install three New Enlarged Sump Pump Pit areas, complete with sediment weirs
Install eight large Grinder Sump Pumps plus backups to handle flow
Box out Underground Storm Water Retention areas - 5,800 cy
Install Two Underground Storm Water Retention Systems - 11,600 sf