Mechanical, Electrical, & Plumbing
-
Chenango Forks Central Schools
ARP - Federal Stimulus Project
Provided upgrades to the High School HVAC system, impacting several locations within the facility.
Replaced four (4) rooftop units with modifications to existing ductwork.
Installed a VRF system within the STEAM Academy.
Removed and replaced acoustical ceiling systems.
-
Deposit CSD - Capital Project
HVAC & Emergency Generator
Upgraded HVAC system covering four (4) elementary. Included placement of ventilators, heat pumps, and condensers.
Provided update to the building’s electrical system to allow for quick connection to portable generator unit. Installation included providing a quick connection panel, emergency panelboards, and an automatic transfer switch.
-
Liverpool Central Schools
Long Branch Elementary
Located and created access to an existing underground ductile iron storm line within the school.
Installed approx. 280 lnft of cured-in-place epoxy lining in the existing storm line.
Backfilled and patched the floor finishes at the four (4) access points.
-
Maine-Endwell CSD - Capital Improvements
Maine Memorial Elementary - Natural Gas Conversion
Coordinated with utility company to provide natural gas services to facility.
Removed and installed large new capacity natural high efficiency gas fueled water heaters.
Removed fuel oil pumps and burners from the facility’s boilers, and replaced with new burners with modulated control panels including integration with the district’s building management system.