Additions & Renovations
-
Sharon Springs CSD - Capital Improvements
District Wide Upgrades
Removal of stone ballast roof and installation of new EPDM roofing, including insulation, wood blocking, and flashing.
Interior renovations of Guidance Suite including new bathroom, new flooring, windowsills, doors, ceilings, lights, walls, and new PTAC units.
Interior renovations of Elementary Classrooms, abate existing floors, installation of new flooring, casework, and unit ventilators.
Interior renovations of corridor bathrooms, removed tile, fixtures, doors, lights, exhaust fan, new tile, fixtures, doors, lights and exhaust fan.
Weight Room addition on second floor, including structural steel, EIFS exterior, relocation of windows, new water cooler, spray fireproofing, removal and reinstallation of ceilings, new lights, and above ceiling unit ventilators.
New soccer field with drainage, walking paths, bleachers, scoreboard relocation, SOD, water hydrant, and water wheel.
Removal of damaged siding at Bus Garage, installation of new siding with snow catchers on roof.
-
Deposit CSD - Capital Improvements
Elementary Upgrades
Removed and replaced resilient flooring in several classrooms and Nurse’s Suite.
Repaired terrazzo through corridors and stairwells.
Replaced cabinetry in kindergarten classrooms.
Updated plumbing in classrooms.
Provided HVAC upgrades.
-
Tompkins County Jail & Public Safety
Limited Modification Project
Replaced exterior security gate system.
Performed masonry restoration at building’s exterior, addressing mortar joints, control joints, and expansion joints.
Installed new concrete pad for designated outdoor employee break area.
Updates to wall paint, carpet flooring, ceilings, and locker room spaces within administrative portion of the building.
Addition of new package passer and detention service window at Public Lobby area.
Reconstruction on holding cells and booking spaces.
Replacement of multiple exterior and interior detention doors, frames, and hardware.
Replacement of cabinetry, including plastic laminate, solid surface, and stainless steel finishes.
Replacement of recreation yard’s overhead coiling door system.
Updates to the correctional kitchen walk-in cooler and freezer units.
Updates to correctional area shower facility.
-
Deposit CSD - Capital Improvements
Middle & High School Upgrades
Gutted and reconstructed areas including classrooms, science labs, technology room, library, Nurse’s suite, and High School main office.
Abated asbestos containing materials at all areas where updates were provided.
Updated plumbing, HVAC, electrical, and fire alarm systems at impacted areas.
All renovated areas included new partitions to create new layouts for the spaces with updated finishes including doors, borrowed lites, flooring, ceilings, millwork and cabinetry, science laboratory cabinetry and equipment.
New exterior windows and window treatments.
-
Deposit CSD - Capital Improvements
Transportation Center Upgrades
Removed the service bays slab on grade.
Updated the trench drain system.
Placed new SOG and applied epoxy finish floor surface.
Provided a radon remediation system.
Updated portions of HVAC equipment in service bay areas.
Replaced multiple electrical devices within the service bay areas.
-
Deposit CSD - Capital Improvements
District Wide Sitework Renovations
Removed and replaced concrete stairs and concrete sidewalks at several locations throughout the campus.
Asphalt pavement replacement and pavement markings completed in various locations throughout the campus.
-
Liverpool Central Schools
Transportation Center Upgrades
Raise two (2) overhead door opening from 10’ to 12’.
Reinstall lintels and patch-in masonry above the new openings.
Install new roof and siding system at the new door openings.
Provide and install two (2) new overhead doors.
-
North Syracuse CSD
District Renovations
Performed selective demolition as required for expanding an exterior chiller enclosure facility.
Placed new foundations and masonry partitions for chiller enclosure.
Fabricated and installed an elevated galvanized structural steel platform for the new chillers to be set.
Provided fencing barrier at chiller area including a fence barrier across the top of the enclosure.
Provided housekeeping pads and miscellaneous interior cutting/patching of masonry walls and plaster ceilings.
-
Owego Apalachin CSD - Capital Project
High School LGI & Maintenance Building Improvements
Updated ceiling, lighting, and wall finishes in LGI Room
Removed and replaced ceiling systems and lighting within the administrative office area of Maintenance Building.
Provided structural steel support framing within the service bay area for new HVAC equipment.
-
Sharon Springs Central Schools
ARP Project
Installation of greenhouse addition, including lights and heating.
Installation of playground pavilion, including lights and security cameras.
-
Susquehanna Valley CSD - Capital Project
High School Building Improvements
Removed and replaced multiple aluminum windows and doors at the High School Kitchen and Cafeteria with new aluminum window and door systems.
-
Tompkins County Mental Health
Lobby Renovations
Upgrade the existing lobby reception area.
Remove the existing windows and vertical columns.
Construction a sloped soffit over the entire reception area.
Install a new secure window system with deal trays and talk throughs.
Modify casework below the existing counter.