18 Eldredge St Binghamton City Parks & Rec

Smith Site Development LLC completed the removal and replacement of the existing floor at Binghamton City Parks and Recreation Maintenance Building. The work included demolishing and removal of entire shop failing floor, replacement of subbase to incorporate new floor drainage system and installed wire mesh with heavy duty rated 6” concrete.

  • Sawcut perimeter of existing floor

  • Hammer demolished 13,300 sq ft floor

  • Regraded and added subbase materials

  • installed wire mesh reinforced with Slip dowels

  • Sae Cut Control Joints & Caulked expansion Joints

  • Installed Exterior perimeter insulation

  • Installed Interior drainage structures

  • Installed 250 CY of heavy duty concrete