Harpursville Central Schools desired Smith Site Development as their designated contractor to ensure (even though with a late 2024 October start) the field was ready for play, spring of 2025. We are thrilled to report that outfield grass sod along with perimeter fencing was installed prior to Thanksgiving and the synthetic turf infield was installed prior to Christmas.
Scope: of work:
• Erosion Control Measures
• Remove Topsoil to resift impurities
• Cut & Fill to Subgrade for Field, Roadways, Parking Areas
• Install Subbase Field and Transportation Center
• Install Underground Storm water systems
• Install Concrete Perimeter Fencing and Spectator bleacher pads
• Install Field Subbase
• Install Underground Utilities
• Install Underground Electrical Lighting
• Install Top Soil and Grass Sod
• Assisted the Installation of the synthetic turf infield
• Landscaping
Install Fence and Gates
Seed and Mulch