Binghamton University Athletic Facility 2011

In 2011, Binghamton University's athletic facility received significant renovations. Smith Site Development helped with these renovations, working on the new baseball, softball, and tennis courts. The work also included site upgrades throughout the facility.

Scope of Work:

  • Erosion Control Measures

  • Remove and Store Top Soil

  • Cut & Fill to Subgrade

  • Install Underground Field and Stormwater Drainage

  • Install Underground Utilities

    • Irrigation

    • Sanitary

    • Electrical & Lighting

  • Install Fields Subbase Material

  • Install Asphalt and Concrete Subbase

  • Install Concrete Sidewalks, Backstop Wall and Handball Wall

  • Install Sod for Both Baseball and Softball Fields

  • Installed New Spectator Bleachers for both Fields

  • Installed Elevated Press Boxes for both Fields

  • Installed Concrete Sidewalks and Specialized Entrances

  • Landscaping

    • Install Fence and Gates

    • Screen & Place Top Soil

    • Seed and Mulch

    • Parking Lot ADA Stripping